Plants in Operation
The Langui Power Plant is 6.2 MW hydroelectric power plant located in the Hercca River in Sicuani, Cusco in southern Peru. It was originally built in 1970 and was expanded twice, first to 3.2 MW later on to 6.2 MW.
Aluz acquired the plant in June 2009 and made the second expansion between 2014 and 2015.
Technical Data
The energy and power generated by Langui are sold to Electro Sur Este S.A. through a long-term Power Purchase Agreement (PPA).